09-20-2022, 05:57 AM
(This post was last modified: 09-20-2022, 06:04 AM by Leotropolis/Reykanes.)
1. Reykanes(surprise!)
2. 0 (2 )(The construction would be cancelled and would be considered as unfinished). The money was put into the project to replace geothermal power since it was location-specific and the fact of possibility of depletion of geothermal sources and high Investment costs for geothermal system.
3. In the 1960s It arrived in Reykanes with cooperation with foreign countries.
4. All the basics for a nuclear power would be researched by late 1980s and Reykani universities would take over the research.
5. 217 billion Credits( Higher than Armenia which has a nuclear power)
6. It was estimated 36% (based on the Armenian number but lowered by 4%
2. 0 (2 )(The construction would be cancelled and would be considered as unfinished). The money was put into the project to replace geothermal power since it was location-specific and the fact of possibility of depletion of geothermal sources and high Investment costs for geothermal system.
3. In the 1960s It arrived in Reykanes with cooperation with foreign countries.
4. All the basics for a nuclear power would be researched by late 1980s and Reykani universities would take over the research.
5. 217 billion Credits( Higher than Armenia which has a nuclear power)
6. It was estimated 36% (based on the Armenian number but lowered by 4%
Signature 100